开发者

What does DB in Completed in 6427ms (View: 6279, DB: 96) mean?

开发者 https://www.devze.com 2023-02-12 04:26 出处:网络
I\'m trying to lighten the page load, and I was curious what the DB in... : Completed in开发者_StackOverflow社区 6427ms (View: 6279, DB: 96)

I'm trying to lighten the page load, and I was curious what the DB in... :

Completed in开发者_StackOverflow社区 6427ms (View: 6279, DB: 96)

...meant ?

Because 6279 + 96 != 6427ms


Quoting the rails guide:

Completed in 5ms (View: 2, DB: 0) | 200 OK [http://0.0.0.0/items]

This data is fairly straightforward to understand. Rails uses millisecond(ms) as the metric to measure the time taken. The complete request spent 5 ms inside Rails, out of which 2 ms were spent rendering views and none was spent communication with the database. It’s safe to assume that the remaining 3 ms were spent inside the controller.